§ 5-6-181. Right of entry for inspection and sampling; compliance schedules.  


Latest version.
  • (a)

    The approval authority, the director, the engineer and other authorized personnel of the city and the authority may inspect any user to ascertain whether the requirements of this division are being complied with. Occupants of premises where wastewater is created for discharging into, or is discharged into, the collection system or the POTW shall allow the approval authority, the director, the engineer and authorized personnel of the city and the authority access to all parts of the premises for the purposes of inspection, sampling, examination and copying of records, or the performance of any duties imposed by this division. The approval authority, the authority and the city shall have the right to set up on the property of a user all equipment and devices necessary to conduct sampling inspections, compliance monitoring and/or metering operations. Where a user has security measures in force which require proper identification and clearance before entry onto its property, the user shall make necessary arrangements so that, upon presentation of suitable identification, the director, the engineer and other personnel from the city and authority, or the approval authority, shall be permitted to enter, without delay, for the purpose of performing an inspection or monitoring.

    (b)

    The approval authority, the authority and the city may require that each industrial user develop a compliance schedule for the installation of technology required to meet applicable pretreatment standards and requirements.

    (c)

    The engineer may require a user to install monitoring equipment. The user at its own expense shall maintain at all times the facility's sampling and monitoring equipment in a safe and proper operating condition. All equipment and devices used to measure wastewater flow and quality shall be calibrated at least every six months by a qualified technician to ensure their accuracy.

    (d)

    Any temporary or permanent obstruction to safe and easy access to the facility to be inspected or where sampling is to be conducted shall be promptly removed by the user at the request of the engineer and shall not be replaced. The cost of clearing such access shall be borne by the user.

    (e)

    Unreasonable delays in allowing the engineer access to the user's premises shall be a violation of this division. (Ord. No. 4501, 10/13/07, Sec. 1)