§ 5-6-121. Pretreatment facilities.  


Latest version.
  • Users shall provide wastewater treatment as is necessary to comply with this division, and shall comply with all categorical pretreatment standards and local limits and with the prohibitions set out in section 5-6-111, within the time limitations specified by federal, state or local regulation or by the authority, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated and maintained at the user's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the authority for review, and must be approved by the authority before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying any such facility to produce a discharge acceptable to the authority under the provisions of this division. The engineer may require a user to have a certified operator on staff to ensure proper operation and maintenance of the pretreatment facility. (Ord. No. 4501, 10/13/07, Sec. 1)